It is time now that a fresh move should be made as regards the further work to be done. The Architect’s private account is now to hand, and will have to be met.
The stonework for the blank windows in the porches is in progress.
A design has been sent to the Rector for some light stencil work round the windows, and a fresh drawing for the large window in the Belfry; there is but a small balance in the bank.“
Church Repairs: April 1904
Stuart Billington
Time period
This page was added on 21/01/2017.
No Comments
Add a comment about this page