The Organ, October 1972

Stuart Billington

The Rector reported that due to water, the organ was in need of repair. A quote from Morgan and Smith was for £320 (about £4,300 today).
A leak in the roof had been repaired in August and the organ had still deteriorated when an inspection was made on September 20th.
Discussion ensued has to how water was leaking in.
It was proposed that the roof repairs should be inspected to see if they were satisfactory, and to leave the repair of the organ until the trouble was found.

(Extract from Parochial Church Council meeting 3rd October 1972)

This page was added on 11/04/2018.

No Comments

Start the ball rolling by posting a comment on this page!

Add a comment about this page

Your email address will not be published.