“The bills for the work lately done in the interior of the Church came to hand in Christmas Week, and the Rector is pleased to be able to report that he was able to meet them.
It was always felt that it was most important that the interior should be completed as quickly as possible . . . . we have every reason to be grateful for having been able to pay our way thus far. However there is a good deal more to be done yet . . . there are five more windows in a more or less dilapidated condition which must be repaired, and other work to be undertaken at the entrances of the Church.”
Church Repairs: January 1904